[clug] OT: Solar power recommendations and advice

Paul Warren paul.warren at anu.edu.au
Wed Apr 21 19:48:40 MDT 2010


-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

<<snips>
>> 2. How good were the quality controls of the manufacturing processes?
>> What, if anything, went wrong and when?
> 
> I had no problems with either product or installation, although Peter Barker
> is having a lot of problems actually getting stock for his system from BBE.


I also am experiencing long delays in BBE getting stock. In January, I
was told there was a 8 to 12 week wait for inverters. It's now coming up
on 16 weeks.  Although the contract states it will be installed within 6
months of a deposit being taken, which will be june 7th, I'm not
confident it will actually happen. Then there's the added difficulty of
getting ACTEWAGL to connect the system to the grid, which I gather can
take another 6 weeks, and a few hundred dollars to upgrade meter boxes
if needed.

BBE I must say were far better organised, helpful and communicative than
Modern Solar who I was originally going through.

All the more reason to get my wind turbine project going :)

Cheers
- --
Paul Warren
NCI NF
ARCS System and Data Services
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.9 (GNU/Linux)
Comment: Using GnuPG with Mozilla - http://enigmail.mozdev.org

iEYEARECAAYFAkvPqvgACgkQkwz3ZmaDjV6p7QCeNHJ8k9gnM98aSzH3FLquZQ3o
Qi4AmwWWTiUgbSVjzJjrWfTDhAsJiGHE
=HOap
-----END PGP SIGNATURE-----


More information about the linux mailing list